徐凤银, 王桂梁, 朱兴珊, 龙荣生. 矿井地质构造定量预测中的难点及其研究[J]. 煤田地质与勘探, 1992, 20(1): 27-33.
引用本文: 徐凤银, 王桂梁, 朱兴珊, 龙荣生. 矿井地质构造定量预测中的难点及其研究[J]. 煤田地质与勘探, 1992, 20(1): 27-33.
Xu Fengyin, Wang Guiliang, Zhu Xingshan, Long Rongsheng. SOME DIFFICULT PROBLEMS AND THEIR PRELIMINARY RESEARCH IN THE QUANTITATIVE FORECAST OF GEOLOGICAL STRUCTURE IN COAL MINE[J]. COAL GEOLOGY & EXPLORATION, 1992, 20(1): 27-33.
Citation: Xu Fengyin, Wang Guiliang, Zhu Xingshan, Long Rongsheng. SOME DIFFICULT PROBLEMS AND THEIR PRELIMINARY RESEARCH IN THE QUANTITATIVE FORECAST OF GEOLOGICAL STRUCTURE IN COAL MINE[J]. COAL GEOLOGY & EXPLORATION, 1992, 20(1): 27-33.

矿井地质构造定量预测中的难点及其研究

SOME DIFFICULT PROBLEMS AND THEIR PRELIMINARY RESEARCH IN THE QUANTITATIVE FORECAST OF GEOLOGICAL STRUCTURE IN COAL MINE

  • 摘要: 鉴于目前矿井构造预测中出现的问题,本文以杉木树矿为例,评介了构造综合研究中所遇到的几个难点,并提出了相应的、在生产实践中应用有效的解决途径,从而为深部开采创造了一个有利的条件。

     

    Abstract: Taking Shanmushu coal mine as an example, aimed at the difficult problem about the forecast of geological structurc in coal mine, this paper evaluates some difficult problems existed in comprehensive research at present, and accorded to the effects which have been gotten,the ways have been put forward relevantly. It will provide a kind of method to the people for developing this work deeply and gradually.

     

/

返回文章
返回