Wang Yimin. DISPLACEMENT MEASUREMENT OF TUNNEL SURROUNDING ROCK AND FINITE ELEMENT ANALYSIS METHOD[J]. COAL GEOLOGY & EXPLORATION, 2000, 28(3): 34-36.
Citation: Wang Yimin. DISPLACEMENT MEASUREMENT OF TUNNEL SURROUNDING ROCK AND FINITE ELEMENT ANALYSIS METHOD[J]. COAL GEOLOGY & EXPLORATION, 2000, 28(3): 34-36.

DISPLACEMENT MEASUREMENT OF TUNNEL SURROUNDING ROCK AND FINITE ELEMENT ANALYSIS METHOD

  • This paper gives the monitoring results of displacement and the monitoring method of constructing deformation on a tunnel surrounding rock,which is located in Changyang County,Hubei Province.There are some positive role to direct the construction and design.It is feasible for anchoring and grouting as a permanent retain of integrated limestone section of the tunnel.It is also available for anchoring and grouting as a temporary(not a permanent) retain of shale when construction on it.The finite element method is used to back calculate the average elastic modulus of the rock mass by the results of monitoring displacement:ERL=5.2×104 kg/cm2,E RS=1.4×104 kg/cm2.The reliance of this results is also analyzed in this paper.It is feasible for back calculation of the elastic modulus to design in practice.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return